<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Sport Archives - Veratec</title>
	<atom:link href="https://veratecgroup.com/portfolio-types/sport/feed/" rel="self" type="application/rss+xml" />
	<link>https://veratecgroup.com/portfolio-types/sport/</link>
	<description>Fraser Valley Premium Engineered Soils</description>
	<lastBuildDate>Wed, 21 Jun 2023 17:25:42 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.5</generator>

<image>
	<url>https://veratecgroup.com/wp-content/uploads/2014/04/cropped-veratec-logo-231x60-32x32.png</url>
	<title>Sport Archives - Veratec</title>
	<link>https://veratecgroup.com/portfolio-types/sport/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Ledgeview Golf + Country Club</title>
		<link>https://veratecgroup.com/project/ledgeview-golf-club/</link>
		
		<dc:creator><![CDATA[Avinesh Bangar]]></dc:creator>
		<pubDate>Wed, 21 Jun 2023 17:23:26 +0000</pubDate>
				<guid isPermaLink="false">https://veratecgroup.com/?post_type=portfolio&#038;p=1378</guid>

					<description><![CDATA[<p>Ledgeview Golf Club was greatly affected by the Trans Mountain Pipeline project; they were required to restore nearly half of the golf course! Veratec was able [&#8230;]</p>
<p>The post <a href="https://veratecgroup.com/project/ledgeview-golf-club/">Ledgeview Golf + Country Club</a> appeared first on <a href="https://veratecgroup.com">Veratec</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h5>Ledgeview Golf Club was greatly affected by the Trans Mountain Pipeline project; they were required to restore nearly half of the golf course! Veratec was able to provide a high-quality turf blend to ensure that the sod used would be vibrant and healthy, allowing the course to re-open the affected holes as soon as possible.</h5>
<hr class="hr_left" />
<h6><strong>Owner</strong><br />
City of Abbotsford</h6>
<h6><strong>Landscape Architect</strong><br />
GDS – Golf Design Services</h6>
<h6><strong>Veratec Products &amp; Services Required</strong><br />
ProSOIL Turf</h6>
<h5>Features</h5>
<hr class="hr_left" />
<ul class="list">
<li>8 holes affected by the Trans Mountain Pipeline project and restored upon completion of the pipeline installation.</li>
<li>2700 cubic yards of ProSOIL Turf used to rebuild the tee boxes, fairways, and greens.</li>
<li>ProSOIL Turf provides a nutrient-rich growing medium made with river sand to allow for exceptional drainage.</li>
</ul>
<p>The post <a href="https://veratecgroup.com/project/ledgeview-golf-club/">Ledgeview Golf + Country Club</a> appeared first on <a href="https://veratecgroup.com">Veratec</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Laura Secord Playfield (Vancouver, B.C.)</title>
		<link>https://veratecgroup.com/project/laura-secord-playfield/</link>
		
		<dc:creator><![CDATA[Michael Uppal]]></dc:creator>
		<pubDate>Sat, 05 Apr 2014 08:38:26 +0000</pubDate>
				<guid isPermaLink="false">http://veratec.wpengine.com/?post_type=portfolio&#038;p=72</guid>

					<description><![CDATA[<p>The Vancouver School Board was in need of replacing an existing field at Laura Secord Elementary. They required a natural grass field that could withstand the [&#8230;]</p>
<p>The post <a href="https://veratecgroup.com/project/laura-secord-playfield/">Laura Secord Playfield (Vancouver, B.C.)</a> appeared first on <a href="https://veratecgroup.com">Veratec</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h5>The Vancouver School Board was in need of replacing an existing field at Laura Secord Elementary. They required a natural grass field that could withstand the high traffic and wet weather conditions.</h5>
<h5>Project Details &#8211; Laura Secord Elementary School Playfield</h5>
<hr class="hr_left" />
<h6><strong>Owner</strong><br />
Vancouver School Board</h6>
<h6><strong>Landscape Architect</strong><br />
Jonathan Losee Ltd.</h6>
<h6><strong>Civil Engineering Consultant</strong><br />
RF Binnie &amp; Associates Ltd.</h6>
<h6><strong>Veratec Products &amp; Services Required</strong><br />
Fibrelok HPRS</h6>
<p>&nbsp;</p>
<h5>Features</h5>
<hr class="hr_left" />
<ul class="list">
<li>Playfield redevelopment for this elementary school was designed to provide a durable natural grass field surrounded by other play structures and amenities</li>
<li>Fibrelok High Performance Rootzone, a custom engineered product based on USGA and ASTM standards, was used to provide a field with excellent drainage characteristics</li>
<li>The fibre-reinforced construction has been proven to increase strength and porosity of the rootzone, resulting in increased compaction resistance and healthier grass with quicker recovery time.</li>
</ul>
<p>The post <a href="https://veratecgroup.com/project/laura-secord-playfield/">Laura Secord Playfield (Vancouver, B.C.)</a> appeared first on <a href="https://veratecgroup.com">Veratec</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
